A party wall award is the legal document in which one or more surveyors settle a dispute between neighbours over proposed building work. It sets out what work will be carried out, how and when it will happen, and any extra work needed to protect the adjoining property. Once the award is served on you, you have 14 days to appeal it in the county court before it becomes final and binding.
What a party wall award is
The Party Wall etc. Act 1996 provides a framework for preventing and resolving disputes in relation to party walls, boundary walls and excavations near neighbouring buildings. The Act came into force on 1 July 1997 and applies throughout England and Wales. It does not apply to Scotland or Northern Ireland. When a homeowner wants to carry out covered work, they must serve written notice on their neighbour well in advance.
If the neighbour dissents or does not reply within 14 days, a dispute is legally created. The appointed surveyor or surveyors will settle the matter by making an "award". This is a binding legal document that grants the building owner the right to execute the work while ensuring the adjoining owner's property is protected.
An award should confine itself to the work relating to the Notices. The document should never cover easements, covenants or general property restrictions that fall outside the scope of the proposed construction.
What a party wall award contains
An award sets out the work that will be carried out, and says when and how it is to be carried out. Under section 10(12) of the Act, an award may determine the right to execute any work, the time and manner of executing any work, and any other matter arising out of the dispute. This includes determining the costs of making the award itself.
The document usually follows a standard structure to ensure all legal requirements are addressed clearly. The GOV.UK explanatory booklet says an award is a legal document prepared by the surveyor or surveyors, with four parts.
This table shows the four standard parts of a party wall award and what each section contains.
|
Part of the award |
What it contains |
|---|---|
|
The legal framework |
The sections of the Act that apply and the names and addresses of all parties. |
|
The description |
The detailed description of the building works that will be carried out. |
|
The rights and duties |
The specific duties and rights of the two property owners during the project. |
|
The conclusion |
The final conclusion including the signatures of the surveyors and the dates. |
These four parts come from the GOV.UK explanatory booklet, which describes itself as a general guide.
The award often contains a record of the condition of the adjoining property before the work begins. Recording a schedule of condition before your neighbour starts building work is not a requirement of the Act, but it is most prudent to do so. An award may be drawn up without it, but proving later damage may be harder.
The document can specify necessary protection to prevent damage to the neighbouring property. The building owner must provide temporary protection for adjacent buildings and property where necessary. The award makes it clear that the building owner is responsible for making good any damage caused by the works.
The booklet says an award can cover several practical points, including:
- The work that will be carried out and how it is to be carried out.
- When the work is to be carried out.
- The temporary protection measures required for the adjoining owner's property.
- Access for the surveyors to inspect the works while they are going on.
- Any additional work that is required.
Who makes the award and how a third surveyor fits in
When a dispute arises, the owners must appoint professionals to resolve it. The owners can agree to use one agreed surveyor to draw up the award together. If they prefer, each owner can appoint their own surveyor, meaning two professionals will handle the matter collaboratively.
You cannot act for yourself in this process. The appointed surveyors must consider both owners' interests and rights and draw up the award impartially.
When two surveyors are appointed, they select a third surveyor. This third surveyor is only called in if the original two cannot agree on a specific point in the award. If you use a single agreed surveyor, there is no third surveyor to call upon.
Where the parties' surveyors make an award, they must serve it forthwith on the parties. The appeal time limit runs from service of the award on you, so note the date it reaches you.
Who pays for the award
Usually, the building owner will pay all costs associated with drawing up the award. This includes the adjoining owner's surveyor's fees, provided the works are solely for the building owner's benefit.
There are exceptions where the adjoining owner may have to pay a share of the costs. If work is needed because of a defect or disrepair that the adjoining owner is responsible for, they may have to pay. They may also pay if they request additional work to be included for their own benefit, with costs then split according to use and responsibility.
The surveyors making the award will decide who pays the fees for drawing it up. Surveyors' fees are a matter for individual surveyors, and there are no set charges laid down in law. The Act provides for the reasonable costs of drawing up an award, and an owner may ask for a breakdown of these costs to understand how the total was reached.
Before work starts, a neighbouring owner can ask for security for expenses. This is usually money, a bond or insurance. The booklet says the provision is usually reserved for particularly intrusive or complex works.
Can you appeal a party wall award?
The award is final and binding unless it is rescinded or modified by a county court on appeal. An appeal goes to the county court.
An appeal should not be undertaken lightly.
If you are considering an appeal, you should speak to a solicitor immediately. They will advise you on whether your case has merit and help you prepare the necessary paperwork. Do not delay, as the time limit is short.
The 14-day appeal deadline
Each owner has 14 days from service of the award on them to appeal to the county court against the award. This time limit is strict and begins on the day the document is served on you. Note the date the award was served on you straight away.
The award is final and binding unless it is rescinded or modified by a county court on appeal, so speak to a solicitor promptly if you think you may want to appeal.
Because the timeframe is so brief, you must read the document as soon as it arrives. Discuss it with your appointed surveyor to ensure you understand what it commits you to and how it affects your property.
What a county court can do on appeal
Under section 10(17) of the Act, either party may appeal to the county court against an award, and the court may rescind the award, which means cancel it.
Alternatively, the court may modify the document in such manner as it thinks fit.
The court will also make a decision about who pays for the legal proceedings. The court may make such order as to costs as it thinks fit. This is a critical factor to consider before launching a challenge.
An unsuccessful appellant may incur an award of costs against them. This means that if you lose the appeal, the court may order you to pay costs. Take legal advice before you decide to appeal.
What happens after the award is made
Once the award is served, the works are carried out under it. The building owner must follow the award, including any protection it requires.
During the works, the award and the Act can affect the adjoining owner in practical ways:
- Allowing entry to the adjoining property after 14 days' notice, except in an emergency.
- Temporary protection for adjacent buildings and property where necessary, which the building owner must provide.
- Permitting the surveyors to inspect the ongoing works to ensure compliance.
- The building owner making good any damage caused by the works.
The award allows access for the surveyors to inspect the works while they are going on.
The Act requires 14 days' notice of entry to the adjoining property, except in an emergency. Refusing or obstructing lawful entry is an offence that can be prosecuted in the magistrates' court.
As the project progresses or concludes, the building owner must make good any damage caused by the works. A schedule of condition, where one was recorded, can help show what has changed. For more on appointing a surveyor, read when you need a party wall surveyor and what it costs.
Common questions
What triggers a party wall dispute?
A dispute is legally created when a homeowner serves a party wall notice and the neighbour either dissents or fails to respond within 14 days. Silence counts as a dispute under the Act. Once a dispute exists, surveyors must be appointed to resolve it through an award.
What is an agreed surveyor for a party wall?
An agreed surveyor is a single professional appointed by both the building owner and the adjoining owner to handle the dispute. They must act impartially to protect the rights of both sides rather than favouring one neighbour.
Can I ask for a party wall award example?
The booklet describes four parts to an award, set out in the table above. An award should confine itself to the work relating to the notices, so read the one drawn up for your own project with your surveyor.
How are party wall surveyor fees calculated?
There are no set charges for this work, and fees are a matter for individual surveyors. The Act allows for reasonable costs, which the surveyors will determine when making the award. An owner may ask for a breakdown of these costs.
What to do next
An award settles the dispute and sets the rules for the building work, unless it is appealed in time. To protect your property and your rights, follow these practical steps as soon as the document arrives.
- Note the exact date the document was served on you so you can track the 14-day appeal window.
- Read the entire document carefully alongside your appointed surveyor to understand the agreed working methods.
- Check that the schedule of condition accurately reflects the current state of your property.
- Confirm that the document only covers the works detailed in the original notices.
- Speak to a solicitor promptly if you believe the document is flawed and you wish to appeal to the county court.
- Prepare to grant access to contractors if you receive the required 14 days' notice of entry.
If you are planning a project or have received a notice from a neighbour, you can find a surveyor near you to discuss your next steps.
Find a top rated surveyor near you
1,550 surveyors across the UK, each ranked on their Google rating and the number of reviews behind it. Start with your county: